LCI Preconstruction & Estimating Training Manual

Project Safety Startup Plan

Expected Due Date:

Check if Applicable

Item

Safety Controls:

Lead Person:

Canopies required?

Traffic and Pedestrian Control Plans needed?

Flaggers / spotters?

Infection control / life safety measures? (Negative air, sticky mats, gondola covers, etc.)

DEMOLITION AND CORING

Engineering survey / demo safety plan needed?

Plan to isolate existing utilities

Emergency planning and water management plan

Core scanning and protection

COLD WEATHER

Temporary heat plan

Enclosed scaffolds / structures

Snow / ice management plan

EXCAVATIONS AND UTILITIES

Utility locates (Public vs. private)

Depths (Space available, undercuts, etc.)

ELECTRICAL

Overhead power lines nearby?

Temporary power plan?

Temporary lighting plan?

Live electrical work?

FALL PROTECTION

Perimeter rails / flagging? (Wood vs. Switchrail)

Perimeter cable by subcontractor?

Project Safety Startup Plan

Page 2 of 4

Updated: Jan 2017