LCI Preconstruction & Estimating Training Manual

Description of Tools Available

Initial/Required Set Up Tools

Reference

1 Tab 01 3 Tab 02

Go-No-Go work sheet

Kick of Meeting with Operations

2 Tab 03-01

Projected cost to bid/budget work sheet Leopardo master filing system (folders)

4 J: Drive

5 Tab 03-04

Sample of team staff org. charts

Standard BDR Tools

6 Tab 07 7 Tab 07 8 Tab 07 9 Tab 07 10 Tab 07 11 Tab 07 12 Tab 07 13 Tab 07 14 Tab 07 15 Tab 07 16 Tab 07

Bid Day Recap;

owner recap

sub recap

area summary break down

alternates

awards tab detail tabs

bond calculator

SSSCEI tab (area breakdown work sheet)

Import tab from bid day

Projected profit worksheet

Preconstruction Tools Preconstruction Core Tools (Includes BDR Above)

17 Tab 13-01 18 Tab 08-03

On Screen Take Off

Narrative (Preconstruction template for clarification/exclusions)

19 Tab 20 20 Tab 21 21 Tab 22 22 Tab 14 23 Tab 18

Cost control log

Master reconciliation spread sheet

Executive summary template- To explain variances in budgets

Project schedule

Site Logistics Plan Balance of Preconstruction tools not included below in the section that can apply to both Preconstruction & Hard Bid

24 Tab 30 25 Tab 11

Award Recommendation authorization form templates

Cost Modeling samples (Value Design- VD)

26 Tab 03-05

Bid package strategy template

27 Tab 11 28 Tab 46 29 Tab 25 30 Tab 45 31 Tab 26 32 Tab 23 33 Tab 50 34 Tab 49 35 Tab 12

Analytical tools (identify cost drivers, assembly costs ….etc.)

Confidentiality agreements

Scope of work templates for contract insertion by market/product type

Sample for performance specs when doing a precon project

Preconstruction Prebid meeting sample for subcontractor meetings

Plan review form and sample

Preconstruction cost spread sheet for projects spanning multiple escalation periods

Leopardo Division 1 Project manual and instruction to bidders

Lead feasibility check list

36 Tab 13-03

Spot Dot

37 Tab 56

Cut Sheet Library

38 Tab 13-02

VDC/Sketch up/Assemble

Hard Bid Tools

39 Tab 06-01 40 Tab 06-02 41 Tab 03-02 42 Tab 03-03

Procedures for hard bidding

Hard Bid - becoming more competitive points

Responsibility matrix (internal document)

Suggested agenda for meetings on the responsibility matrix