Bid Proposal 1093-2 Security Camera Replacement Graphics

3

1

2

4

EXCERPT FROM W.Y. COCKEN & E.J. HERGENROEDER ARCHITECTS DRAWING NO. S-4 DATED FEB.,10, 1954 FOR REFERENCE ONLY

D

NOTES: 1. NO PENETRATIONS ARE PERMITTED IN THE 2" SECTION BETWEEN TILES.

2. WHERE FLOOR PENETRATIONS ARE MADE, A MINIMUM SPACE OF ONE (1) DIAMETER OF THE PENETRATION SHALL BE LEFT BETWEEN ADJACENT PENETRATIONS. WHERE TWO DIFFERENT DIAMETERS ARE ADJACENT, THE LARGER DIAMETER SHALL BE USED FOR THE SPACE. 3. HANGING LOADS ARE PERMITTED TO USE TOGGLE BOLTS OR ADHESIVE ANCHORS. EXPANSION ANCHORS ARE NOT PERMITTED FOR HANGING LOADS. 4. FOR FLOOR MOUNTED LOADS ADHESIVE ANCHORS OR EXPANSION ANCHORS ARE PERMITTED. 5. PRIOR TO MAKING ANY FLOOR PENETRATIONS THE CONTRACTOR SHALL USE NON-DESTRUCTIVE TESTING TO LOCATE THE #9 REINFORCING MEMBERS.

EXPOSED CEILING MOUNTED CAMERA DETAIL

1

Scale: NOT TO SCALE

J-HOOK DETAIL

C

2

Scale: NOT TO SCALE

1 RU CISCO CATALYST 9300 2 RU 48-PORT COPPER PATCH PANEL 1 RU OPEN 1 RU CISCO CATALYST 9300 2 RU 48-PORT COPPER PATCH PANEL 1 RU OPEN 1 RU CISCO CATALYST 9300 2 RU 48-PORT COPPER PATCH PANEL 1 RU OPEN 1 RU CISCO CATALYST 9300 2 RU 48-PORT COPPER PATCH PANEL 1 RU OPEN 1 RU CISCO CATALYST 9300 2 RU HORIZONTAL WIRE MANAGER 1 RU CISCO CATALYST 9300 1 RU OPEN 2 RU 48-PORT COPPER PATCH PANEL

45

45

44

44

43

43

42

42

41

41

40

40

39

39

38

38

37

37

36

36

35

35

34

34

33

33

32

32

31

31

30

30

29

29

28

28

27

27

B

26

26

25

25

24

24

PROVIDE AND INSTALL 48-PORT COPPER PATCH PANEL FOR TERMINATION OF THE NEW DATA CABLING FOR NEW

23

23

CAMERA'S

22

22

2 RU HORIZONTAL WIRE MANAGER

PROVIDE AND INSTALL HORIZONTAL WIRE MANAGER

ROOM #

21

21

20

20

PROVIDE AND INSTALL 48-PORT COPPER PATCH PANEL FOR TERMINATION OF THE NEW DATA CABLING FOR NEW

2 RU 48-PORT COPPER PATCH PANEL

CABINET #

MDF CABINET/LIU PANEL

19

19

OPTICAL

LABEL AFFIXED TO CABLE AND COVERED WITH CLEAR ADHESIVE TAPE. SEE LABEL FORMAT DETAIL FOR MORE

IDENTIFICATION

CAMERA'S

FIBER

PANEL #

18

18

CABLING

17

17

PORT #

INFORMATION.

16

16

15

15

21 - B1 - 01 - 100 535 - B1 - 01 -100

14

14

NOTE:

21 - B1 - 01 - 100 535 - B1 - 01 -100

13

13

U.N.O. RACK ELEVATION PROVIDED FOR REFERENCE. EXISTING EQUIPMENT WITHIN THIS RACK SHALL REMAIN.

12

12

11

11

10

10

NOTES: 1. LABELING SHALL BE ON A WHITE BACKGROUND WITH BLACK LETTERS AND COVERED WITH A CLEAR TAPE COVERING. 2. LABELS SHALL BE PLACED NO CLOSER THAN 12" AND NOT FURTHER THAN 18" FROM ENDS OF CABLE (THIS APPLIES TO BOTH ENDS OF THE CABLE).

PORT #

09

09

08

08

PANEL #

CABINET/LIU PANEL IDENTIFICATION

07

07

CABINET #

06

06

05

05

ROOM #

2 RU RACK MOUNT APC PDU ETR

04

04

03

03

2 RU RACK MOUNT APC PDU ETR

02

02

1 RU RACK MOUNT GROUNDING BUSBAR

LABEL LOCATION AND APPLICATION

LABEL FORMAT DETAIL

01

01

A

TYPICAL OPTICAL FIBER CABLE LABELING SCHEME DETAIL

RACK G08 ELEVATION

3

4

Scale: NOT TO SCALE

Scale: NOT TO SCALE

HFL 2021-2019

3

4

1

2

Made with FlippingBook Annual report maker