Bid Proposal 1093-2 Security Camera Replacement Graphics

3

1

2

4

1. ALL EXPOSED CABLE SHALL BE RUN IN CONDUIT, ON EXISTING CABLE TRAY OR SECURED TO CABLE TRAY UTILIZING J-HOOKS UNO. FIELD COORDINATE ALL CONDUIT ROUTES. PROVIDE ALL SUPPORT MATERIALS AND HARDWARE FOR A COMPLETE INSTALLATION. PROVIDE JUNCTION 2. FIELD COORDINATE ALL FINAL CONDUIT SLEEVE AND PENETRATION LOCATIONS TO AVOID ANY EXISTING OBSTRUCTIONS. SEAL ALL THRU WALL/FLOOR PENETRATIONS AS REQUIRED PER IBC. 3. USE OF CABLE ZIP TIES TO PREVENT OVER TIGHTENING AND DAMAGE TO CABLES IS PROHIBITED. 4. ALL CABLES ARE TO BE ROUTED TO RACK G08 ON THE THIRD FLOOR IN THE DATA CENTER. 5. DO NOT MODIFY STRUCTURAL MEMBERS LOCATED IN CHASEWAY. BOXES AS REQUIRED. GENERAL NOTES (APPLIES TO ALL DRAWINGS):

3

D

EXT-9

1

J

J

9

1

9

KEYNOTES:

1. PROVIDE 6"x6"x4" JUNCTION BOX. FIELD COORDINATE EXACT LOCATION. 2. PROVIDE BUSHINGS ON CONDUIT ENDS - ROUTE CABLE VIA SLEEVES TO THIRD FLOOR. PROVIDE 2" SLEEVE TO FIRST FLOOR AND (2) SPARE 2" SLEEVES. ROUTE CABLE THROUGH BASEMENT. 3. FIELD COORDINATE EXTERIOR CAMERA MOUNTING HEIGHT. ESTIMATED HEIGHT 12'-0". 4. REMOVE EXISTING CAMERA AND CABLE BACK TO SOURCE. 5. CONDUITS TO PARKING CONTROLS AND PANEL BOARD. INTERCEPT COAX CABLE ROUTED TO PARKING GATE PEDISTAL MOUNTED CAMERA. PROVIDE COAX TO CAT6 IMPEDANCE MATCHING DEVICE. ROUTE CAT6 TO DATA CENTER ON 3RD FLOOR. REMOVE INTERIOR COAX CABLE. 6. NOT USED. 7. PROVIDE 2" SLEEVE FOR PENETRATION THROUGH WALL. 8. FIELD COORDINATE EXTERIOR CAMERA MOUNTING HEIGHT. ESTIMATED HEIGHT 12'-0". ROUTE CABLE THROUGH BASEMENT. 9. CAT6 CABLE TO BE ROUTED THROUGH BASEMENT TO EACH CAMERA LOCATION. SECURE CABLE TO CEILING EVERY FIVE FEET.

8

270°

EXT-5

J

1

9

J

1

C

9

PROVIDE AND INSTALL 2" SLEEVE TO FIRST FLOOR

1

9

1

J

J

012B-1

EXT-6

4

9

180°

2

012A-1

J

9

1

7

EXISTING PANEL PBX 120/208V, 60A, MLO

J J

J

B

5

1

015-1

EXISTING (2) 4" EMT TO PARKING LOT, ETR

ALTERNATE 1

BASEMENT FLOOR - SECURITY

1

Scale: 1/8" = 1'-0"

0

8'

16'

4'

SCALE: 1/8" = 1'-0"

A

HFL 2021-2019

3

4

1

2

Made with FlippingBook Annual report maker