GENERAL NOTES (APPLIES TO ALL DRAWINGS): 1. ALL EXPOSED CABLE SHALL BE RUN IN CONDUIT, ON EXISTING CABLE TRAY OR SECURED TO CABLE TRAY UTILIZING J-HOOKS UNO. FIELD COORDINATE ALL CONDUIT ROUTES. PROVIDE ALL SUPPORT MATERIALS AND HARDWARE FOR A COMPLETE INSTALLATION. PROVIDE JUNCTION BOXES AS REQUIRED. 2. FIELD COORDINATE ALL FINAL CONDUIT SLEEVE AND PENETRATION LOCATIONS TO AVOID ANY EXISTING OBSTRUCTIONS. SEAL ALL THRU WALL/FLOOR PENETRATIONS AS REQUIRED PER IBC. 3. USE OF CABLE ZIP TIES TO PREVENT OVER TIGHTENING AND DAMAGE TO CABLES IS PROHIBITED. 4. ALL CABLES ARE TO BE ROUTED TO RACK G08 ON THE THIRD FLOOR IN
6
270°
EXT-3
PLANTER
D
3/4" CONDUIT
6
9
J
ROUTE CABLE ON J-HOOKS ABOVE ACT
THE DATA CENTER.
7
5. DO NOT MODIFY STRUCTURAL MEMBERS LOCATED IN CHASEWAY.
125-1 180°
KEYNOTES: 1. REMOVE EXISTING "66 WIRING BLOCKS" AND TELEPHONE COPPER WIRING IN EXISTING RISER. KEEP EXISTING PLYWOOD. 2. PROVIDE AND INSTALL 2" SLEEVE FOR PENETRATION TROUGH WALL 3. PROVIDE AND INSTALL 2" HORIZONTAL SLEEVE FOR ACCESS TO RISER. REMOVE RECESSED LIGHTING FIXTURE AT EXISTING BULKHEAD RISER LOCATION. PROVIDE (2) LED FIXTURES AT NEW BULKHEAD - DAYBRITE 1-SDL-27L-835-4-D-UNV-GLR - RECIRCUIT TO NEW FIXTURES. 4. PROVIDE AND INSTALL (2) 2" SLEEVES AT EACH FLOOR FOR FUTURE ABOVE CEILING. 5. WORK. FIELD COORDINATE EXTERIOR CAMERA MOUNTING HEIGHT. ESTIMATED HEIGHT 15'-0". ROUTE CABLE TO FIRST FLOOR CEILING. 6. REMOVE EXISTING CAMERA AND CABLE BACK TO SOURCE. 7. EXTEND 3/4" CONDUIT TO ABOVE CEILING IN CORRIDOR. 8. CONCEAL CABLE ABOVE CEILING VIA J-HOOKS AND CABLE TRAY TO RISER. 9. PROVIDE AND INSTALL 6"x6"x4" JUNCTION BOX. FIELD COORDINATE EXACT LOCATION. 10. FIELD COORDINATE EXTERIOR CAMERA MOUNTING HEIGHT. ESTIMATED HEIGHT 12'-0". ROUTE CABLE TO FIRST FLOOR CEILING. 11. FIELD COORDINATE EXTERIOR CAMERA MOUNTING HEIGHT. ESTIMATED HEIGHT 12'-6". ROUTE CABLE TO FIRST FLOOR CEILING.
3/4" CONDUIT
9
PEDESTAL
ETR
J
ETR
IC
CAM
6
8
EXT-4
6
IC CAM
EXT-2
100K-1
8
6
8
C
PROVIDE AND INSTALL WIREMOLD 500 FROM CAMERA TO ABOVE CORRIDOR WITH 1" WALL SLEEVE.
2
100F-1 180°
8
100B-1
101-1
8
1 3 4
8
360°
2
6
2
6
101-2
PROVIDE AND INSTALL 2" SLEEVE TO BASEMENT
B
PROVIDE AND INSTALL 2" SLEEVE TO 2ND FLOOR
8
EXT-1
IC CAM
270°
270°
8
5
10 8
6
EXT-7
EXT-8
FIRST FLOOR - SECURITY
1
0
8'
16'
4'
Scale: 1/8" = 1'-0"
SCALE: 1/8" = 1'-0"
A
HFL 2021-2019
3
4
1
2
Made with FlippingBook Annual report maker