3
1
2
4
GENERAL NOTES (APPLIES TO ALL DRAWINGS): 1. ALL EXPOSED CABLE SHALL BE RUN IN CONDUIT, ON EXISTING CABLE TRAY COORDINATE ALL CONDUIT ROUTES. PROVIDE ALL SUPPORT MATERIALS AND HARDWARE FOR A COMPLETE INSTALLATION. PROVIDE JUNCTION BOXES AS REQUIRED. 2. FIELD COORDINATE ALL FINAL CONDUIT SLEEVE AND PENETRATION LOCATIONS TO AVOID ANY EXISTING OBSTRUCTIONS. SEAL ALL THRU WALL/FLOOR PENETRATIONS AS REQUIRED PER IBC. 3. USE OF CABLE ZIP TIES TO PREVENT OVER TIGHTENING AND DAMAGE TO CABLES IS PROHIBITED. 4. ALL CABLES ARE TO BE ROUTED TO RACK G08 ON THE THIRD FLOOR IN THE DATA CENTER. 5. DO NOT MODIFY STRUCTURAL MEMBERS LOCATED IN CHASEWAY. KEYNOTES: 1. REMOVE EXISTING "66 WIRING BLOCKS" AND TELEPHONE COPPER WIRING IN EXISTING RISER. KEEP EXISTING PLYWOOD AND DUPLEX RECEPTACLE. 2. CONCEAL CABLE ABOVE CEILING VIA J-HOOKS AND CABLE TRAY TO RISER. 3. PROVIDE AND INSTALL 2" HORIZONTAL SLEEVE FOR ACCESS TO RISER. REMOVE RECESSED LIGHTING FIXTURE AT EXISTING BULKHEAD RISER LOCATION. PROVIDE AND INSTALL (2) LED FIXTURES AT NEW BULKHEAD - DAYBRITE 1-SDL-27L-835-4-D-UNV-GLR - RECIRCUIT TO NEW FIXTURES. 4. PROVIDE AND INSTALL (2) 2" SLEEVES TO EACH FLOOR FOR FUTURE WORK.
D
C
200G-1
2
1 3 4
2
200E-1
PROVIDE AND
PROVIDE AND
ALTERNATE 1
INSTALL 2" SLEEVE TO 3RD FLOOR
INSTALL 2" SLEEVE TO 1ST FLOOR
ALTERNATE 1
B
SECOND FLOOR - SECURITY
1
0
8'
16'
4'
Scale: 1/8" = 1'-0"
SCALE: 1/8" = 1'-0"
A
HFL 2021-2019
3
4
1
2
Made with FlippingBook Annual report maker