3
1
2
4
1
2
3
4
5
6
7
8
5A
6A
GEN DRA
7A
1. ALL EXPOSED CABLE SHALL BE RUN IN CONDUIT, ON EXISTING CABLE TRAY COORDINATE ALL CONDUIT ROUTES. PROVIDE ALL SUPPORT MATERIALS AND HARDWARE FOR A COMPLETE INSTALLATION. PROVIDE JUNCTION BOXES AS REQUIRED. 2. FIELD COORDINATE ALL FINAL CONDUIT SLEEVE AND PENETRATION LOCATIONS TO AVOID ANY EXISTING OBSTRUCTIONS. SEAL ALL THRU WALL/FLOOR PENETRATIONS AS REQUIRED PER IBC. 3. USE OF CABLE ZIP TIES TO PREVENT OVER TIGHTENING AND DAMAGE TO CABLES IS PROHIBITED. 4. ALL CABLES ARE TO BE ROUTED TO RACK G08 ON THE THIRD FLOOR IN THE DATA CENTER. 5. DO NOT MODIFY STRUCTURAL MEMBERS LOCATED IN CHASEWAY. KEYNOTES: 1. REMOVE EXISTING "66 WIRING BLOCKS" AND TELEPHONE COPPER WIRING IN EXISTING RISER. KEEP EXISTING PLYWOOD AND 4-PLEX RECEPTACLE. 2. PROVIDE AND INSTALL 4" SLEEVE FOR PENETRATION TROUGH WALL ABOVE CEILING. 3. PROVIDE AND INSTALL 2" HORIZONTAL SLEEVE FOR ACCESS TO RISER. REMOVE RECESSED LIGHTING FIXTURE AT EXISTING BULKHEAD RISER LOCATION. PROVIDE AND INSTALL (2) LED FIXTURES AT NEW BULKHEAD - DAYBRITE 1-SDL-27L-835-4-D-UNV-GLR - RECIRCUIT TO NEW FIXTURES. 4. PROVIDE AND INSTALL (2) 2" SLEEVES TO EACH FLOOR FOR FUTURE WORK. 5. PROVIDE AND INSTALL WIREMOLD 500 TO ABOVE CORRIDOR CEILING WITH 1" SLEEVE AT WALL. 6. REMOVE CAMERA AND CABLE TO SOURCE.
Z
D
321
322
Y
323
320
300i
X
319
324
A
325
C
326
316
317
318
327
300J
316-1 360°
G8
B
304C
G7
300D
360° 316-5
300K
G6
300B
328
G5
304B PROVIDE AND INSTALL 2" SLEEVE TO 4TH FLOOR
5
G4
329
304A
316-3 360°
300F
G3
300C
G2
2
G1
315
1
330
360°
3
4
300A
304
306
300
316-4
300G
C
300E
300E-1
300-1
B
PROVIDE AND INSTALL 2" SLEEVE TO 2ND FLOOR
331
314
312
311
310
309
308
307
305
303
302
301
313
D
THIRD FLOOR - SECURITY 0
1
8'
16'
4'
Scale: 1/8" = 1'-0"
SCALE: 1/8" = 1'-0"
A
HFL 2021-2019
3
4
1
2
Made with FlippingBook Annual report maker