Bid Proposal 1093-2 Security Camera Replacement Graphics

3

1

2

4

GENERAL NOTES (APPLIES TO ALL DRAWINGS): 1. ALL EXPOSED CABLE SHALL BE RUN IN CONDUIT, ON EXISTING CABLE TRAY COORDINATE ALL CONDUIT ROUTES. PROVIDE ALL SUPPORT MATERIALS AND HARDWARE FOR A COMPLETE INSTALLATION. PROVIDE JUNCTION BOXES AS REQUIRED. 2. FIELD COORDINATE ALL FINAL CONDUIT SLEEVE AND PENETRATION LOCATIONS TO AVOID ANY EXISTING OBSTRUCTIONS. SEAL ALL THRU WALL/FLOOR PENETRATIONS AS REQUIRED PER IBC. 3. USE OF CABLE ZIP TIES TO PREVENT OVER TIGHTENING AND DAMAGE TO CABLES IS PROHIBITED. 4. ALL CABLES ARE TO BE ROUTED TO RACK G08 ON THE THIRD FLOOR IN THE DATA CENTER. 5. DO NOT MODIFY STRUCTURAL MEMBERS LOCATED IN CHASEWAY. KEYNOTES: 1. REMOVE EXISTING "66 WIRING BLOCKS" AND TELEPHONE COPPER WIRING IN EXISTING RISER. RELOCATE EXISTING PLYWOOD TO BACK OF RISER ACCESS PANEL 2. CONCEAL CABLE ABOVE CEILING VIA CABLE TRAY AND J-HOOKS. 3. PROVIDE AND INSTALL 2" HORIZONTAL SLEEVE FOR ACCESS TO RISER. REMOVE RECESSED LIGHTING FIXTURE AT EXISTING BULKHEAD RISER LOCATION. PROVIDE AND INSTALL (2) LED FIXTURES AT NEW BULKHEAD - DAYBRITE 1-SDL-27L-835-4-D-UNV-GLR - RECIRCUIT TO NEW FIXTURES. 4. PROVIDE AND INSTALL (2) 2" SLEEVES TO EACH FLOOR FOR FUTURE WORK.

D

C

400G-1

2

1 3 4

2

400E-1

PROVIDE AND INSTALL 2" SLEEVE TO 3RD FLOOR PROVIDE AND INSTALL 2" SLEEVE TO 5TH FLOOR

ALTERNATE 1

ALTERNATE 1

B

FOURTH FLOOR - SECURITY

1

0

8'

16'

4'

Scale: 1/8" = 1'-0"

SCALE: 1/8" = 1'-0"

A

HFL 2021-2019

3

4

1

2

Made with FlippingBook Annual report maker