3
1
2
4
GENERAL NOTES (APPLIES TO ALL DRAWINGS): 1. ALL EXPOSED CABLE SHALL BE RUN IN CONDUIT, ON EXISTING CABLE TRAY COORDINATE ALL CONDUIT ROUTES. PROVIDE ALL SUPPORT MATERIALS AND HARDWARE FOR A COMPLETE INSTALLATION. PROVIDE JUNCTION BOXES AS REQUIRED. 2. FIELD COORDINATE ALL FINAL CONDUIT SLEEVE AND PENETRATION LOCATIONS TO AVOID ANY EXISTING OBSTRUCTIONS. SEAL ALL THRU WALL/FLOOR PENETRATIONS AS REQUIRED PER IBC. 3. USE OF CABLE ZIP TIES TO PREVENT OVER TIGHTENING AND DAMAGE TO CABLES IS PROHIBITED. 4. ALL CABLES ARE TO BE ROUTED TO RACK G08 ON THE THIRD FLOOR IN THE DATA CENTER. 5. DO NOT MODIFY STRUCTURAL MEMBERS LOCATED IN CHASEWAY. KEYNOTES: 1. REMOVE EXISTING "66 WIRING BLOCKS" AND TELEPHONE COPPER WIRING IN EXISTING RISER. RELOCATE EXISTING PLYWOOD TO BACK OF RISER ACCESS PANEL. 2. PROVIDE AND INSTALL 2" HORIZONTAL SLEEVE FOR ACCESS TO RISER. REMOVE RECESSED LIGHTING FIXTURE AT EXISTING BULKHEAD RISER LOCATION. PROVIDE AND INSTALL (2) LED FIXTURES AT NEW BULKHEAD - DAYBRITE 1-SDL-27L-835-4-D-UNV-GLR - RECIRCUIT TO NEW FIXTURES. 3. PROVIDE AND INSTALL (2) 2" SLEEVES TO EACH FLOOR FOR FUTURE WORK. 4. CONCEAL CABLE ABOVE CEILING VIA CABLE TRAY AND J-HOOKS.
D
508
515
511
513B
509
512
514
513
513A
513C
507
4
360°
360°
500G-2
500I
500G
4
500G-1
516
504C
C
516
500D
500J
504B
500C
500F
504A
503
500H
506
501A
505
500A
500E
180°
500J-1
516-1 270°
J
4
1
3
2
PROVIDE AND
ALTERNATE 1
WEATHER PROOF CAMERA AND BOX W/ GASKET
INSTALL 2" SLEEVE TO 4TH FLOOR
ALTERNATE 1
ROOF DECK
B
FIFTH FLOOR - SECURITY
1
0
8'
16'
4'
Scale: 1/8" = 1'-0"
SCALE: 1/8" = 1'-0"
A
HFL 2021-2019
3
4
1
2
Made with FlippingBook Annual report maker