REQUEST FOR PROPOSAL 3129 INSPECTION AND TESTING OF FIRE PROTECTION SYSTEMS AND RELATED CONTROLS - COLLEGE WIDE
PRICE SHEET
ANNUAL GRAND TOTAL (from accompanying Excel spreadsheet)
$
CCAC shall have the right to extend the agreement beyond the first year with option years noted at 2% increase per year on prices proposed.
Labor rate per hour for work performed outside the scope of work (normal hours): $____________
Labor rate per hour for work performed outside the scope of work (overtime rate): $____________
Materials used outside the scope of work at cost plus: ___________%
Standard work hours are __________ to __________
Provide names of manufacturers of fire panels capable of being serviced or programmed:
Company Name: ________________________________________________________
19
Made with FlippingBook. PDF to flipbook with ease