Bid 1093 - Security Replacement Project at OCS - Invitation…

MATERIAL AND EQUIPMENT

SECTION 0l600

Section 0l600 - Page 0l600-l

MATERIAL AND EQUIPMENT

PART l GENERAL

l.

0l REQUIREMENTS INCLUDED A. Products B. Workmanship C.

Manufacturers' Instructions Transportation and Handling

D. E. F.

Storage and Protection

Substitutions and Product Options

l.2

RELATED REQUIREMENTS A.

Section 0l0l0 - Summary of Project

B.

Section 0l300 - Submittals: Submittal of Manufacturers' Certificates Section 0l700 - Contract Closeout: Operation and Maintenance Data & Warranties.

C.

l.3

PRODUCTS A.

Products include all material, equipment and systems.

B. Comply with Specifications and referenced standards as minimum requirements. C. Components required to be supplied in quantity within a Specification section shall be the same and shall be interchangeable. D. Do not use materials and equipment removed from existing structure, except as specifically required or allowed by Contract Documents.

l.4

WORKMANSHIP A.

Comply with industry standards except when more restrictive tolerances or specified requirements indicate more rigid standards or more precise workmanship. Perform work by persons qualified to produce workmanship of specified quality. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration and racking.

B.

C.

Made with FlippingBook Online newsletter maker