MATERIAL AND EQUIPMENT

Section 01600 - Page 01600-2

l.5

MANUFACTURERS' INSTRUCTIONS A.

When work is specified to comply with manufacturers' instruction, submit copies as specified in Section 0l300, distribute copies to persons involved and maintain one set in field office. B. Perform work in accordance with details of instruction and specified requirements. Should a conflict exist between Specifications and instructions, consult with Owner. TRANSPORTATION AND HANDLING A. Transport Products by methods to avoid Product damage; deliver in undamaged condition in manufacturer's unopened containers or packaging, dry. B. Provide equipment and personnel to handle Products by methods to prevent damage. C. Promptly inspect shipments to assure that Products comply with requirements, quantities are correct and Products are undamaged. Store Products in accordance with manufacturer's instructions, with seals and labels intact and legible. Store sensitive Products in weather-tight enclosures. B. Arrange storage to provide access for inspection. Periodically inspect to assure products are undamaged, and are maintained under required conditions. C. After installation, each Contractor shall provide coverings to protect all installed products from damage due to traffic and construction operations, remove when no longer needed. ALL damaged products shall be replaced at no cost to the College. STORAGE AND PROTECTION A.

l.6

l.7

l.8

PRODUCT OPTIONS A.

Within fifteen (l5) days after date of award of Contract, submit complete list of major Products and equipment proposed, with name of manufacturer, trade name and model.

Made with FlippingBook Online newsletter maker