MATERIAL AND EQUIPMENT
_
Section 01600 - Page 01600-3
B.
Options: l. Products specified only by reference standard: Any Product meeting that standard. 2. Products specified by naming several manufacturers: Products of any named manufacturer meeting Specifications.
3.
Products specified by naming one or more manufacturers and "or equal": Submit a request for substitution for any manufacturer not specifically named. Products specified by naming only one manufacturer: No option, product substitution will not be considered.
4.
l.9
SUBSTITUTIONS A.
Where drawings and specifications call for materials of certain manufacturers, the contract shall be based on materials specified. If the Contractor wishes to offer substitutions for consideration, he must request approval ten (10) days prior to bid opening and abide by Section 15500, paragraph 1.07. Any substitutions made after the bid is received will not be accepted. A bidder intending to furnish an alternate in place of the item or equipment specified is required to submit a written request to the College along with the following items no less than ten (10) business days prior to bid opening date. 1. Provide all current published specification data sheets on all components highlighting the comparable specifications to the specified items. 2. Provide third party testing data that shows physical and performance attributes of the proposed equipment with those of the specified product.
Made with FlippingBook Online newsletter maker