SECTION 0l720

Section 0l720 - Page 0l720-l

PROJECT RECORD DOCUMENTS

PART l GENERAL

l.

0l REQUIREMENTS INCLUDED A. Each Contractor shall maintain at the site for the Owner one record copy of: l. Drawings 2. Specifications 3. Addenda 4. Change Orders and other Modifications to the Contract 5. Approved Shop Drawings, Product Data and Samples B. At the completion of the work, the Contractor shall deliver to the Engineer the complete set of documents, including changes made to that date on which he shall have recorded as required by the General Conditions, changes or discrepancies between the Drawings and the actual locations or dimensions of member, materials or equipment in the buildings whether architectural, mechanical or electrical.

l.2

RELATED REQUIREMENTS A.

Section 0l300 - Submittals

B. C.

Section 0l730 - Operating & Maintenance Data

Section 0l740 - Warranties

l.3

MAINTENANCE OF DOCUMENTS AND SAMPLES A. Store documents and samples in locked cabinet and secure storage space apart from documents used for construction. B. File documents and samples in accordance with CSI l6 Division format. C. Maintain documents in a clean, dry, legible condition and in good order. Do not use record documents for construction purposes. D. Make documents and samples available at all times for inspection by Owner.

Made with FlippingBook Online newsletter maker