Bid 1093 - Security Replacement Project at OCS - Invitation…

BASIC ELECTRICAL MATERIALS AND METHODS

Section 0l750 - Page 0l750-3

1.3 REQUIREMENTS A. Examination of Contract Documents: Carefully examine the electrical drawings and these specifications. If any discrepancies occur between the drawings or between the drawings and the specifications, report such discrepancies to the Engineer in writing and obtain written instructions as to the manner in which to proceed. No departures from the contract drawings or specifications shall be made without prior written approval of the Engineer. B. Any discrepancies shall be reported at least 10 days prior to submission of bid. In the event that such discrepancies are not reported in this manner, the Contractor shall accept the Engineer's interpretation and/or clarification. C. Examination of the Site: Visit and examine the site of the work and become acquainted with existing conditions before submitting proposal. This Contractor will be held responsible for the installation of all work complete in every detail. Verify and secure all measurements at the site. D. Standards of Material and Workmanship: All work shall be executed by persons skilled in the work to which they are assigned. All materials and equipment furnished for the project shall be new and of first quality, produced by manufacturers who have been regularly engaged in the manufacture of these products for a period of not less than twenty years. E. Where there is more than one item of similar equipment required under this Contract, all such similar equipment shall be the product of one manufacturer. F. All materials furnished under this contract shall be determined safe by a Nationally Recognized Testing Laboratory, such as Underwriters' Laboratories, Inc., or Factory Mutual Engineering Corporation, and all material shall be labeled, certified or listed by such testing facility.

Made with FlippingBook Online newsletter maker