Bid 1093 - Security Replacement Project at OCS - Invitation…

BASIC ELECTRICAL MATERIALS AND METHODS

Section 0l750 - Page 0l750-8

F. Storage of Materials and Equipment 1. Store material and equipment in a location that will not interfere with the operations of other Contractors or the Owner, and in a manner that will afford them maximum protection. G. Cutting and Patching 1. Where openings are required in work already in place, all cutting and patching shall be done by or at the expense of this Contractor. 2. This Contractor shall consult with the Engineer before cutting any openings, and shall cut such openings in an approved manner so that they will not weaken or damage any structural part of the building. H. Painting 1. Remove rust, clean and paint all auxiliary steel members and parts installed by this Contractor for the support of his work, using one coat of a rust inhibiting primer before erection. After the steel members are in place, paint with one coat of light grey oil paint. I. Shop Drawings and Samples 1. Submit shop drawings for all items of material and equipment as herein and after specified. Review the shop drawings prior to submission and verify that they are complete, including the following minimum information: complete construction details including dimensions, materials, and finishes; diagrams or illustration showing physical characteristics; performance data; description of operation; name of laboratory by which item will be labeled, certified, or listed; and where applicable, wiring diagrams showing the connections of all components of related equipment.

Made with FlippingBook Online newsletter maker