Bid 1093 - Security Replacement Project at OCS - Invitation…

Community College of Allegheny County OCS Security Camera System Pittsburgh, PA

1.3

SEQUENCING

A. Conduct and submit results of power system studies before submitting Product Data and Shop Drawings for electrical equipment.

1.4

SCHEDULING

A.

TBD.

1.5

ACTION SUBMITTALS

A. Coordination Drawings for Structural Supports: Show coordination of structural supports for equipment and devices, including restraints and bracing for control of seismic and wind loads, with other systems, equipment, and structural supports in the vicinity. B. Coordination Drawings for Conduit Routing: Conduit routing plans, drawn to scale, on which the following items are shown and coordinated with each other, using input from installers of items involved: 1. Structural members in paths of conduit groups with common supports. 2. HVAC and plumbing items and architectural features in paths of conduit groups with common supports.

1.6

INFORMATIONAL SUBMITTALS

A. Electrical Installation Schedule: At preconstruction meeting, and periodically thereafter as dates change, provide schedule for electrical installation Work to Owner and Engineer including, but not limited to, milestone dates for the following activities: 1. Submission of power system studies. 2. Submission of specified coordination drawings. 3. Submission of action submittals specified in Division 26. 4. Orders placed for major electrical equipment. 5. Arrival of major electrical equipment on-site. 6. Preinstallation meetings specified in Division 26. 7. Closing of walls and ceilings containing electrical Work. 8. System startup, testing, and commissioning activities for major electrical equipment. 9. System startup, testing, and commissioning activities for automation systems (BMS, lighting, HVAC, fire alarm, etc.). 10. Requests for special inspections. 11. Requests for inspections by authorities having jurisdiction. B. Certificates: 1. Welding certificates.

260010-5

Made with FlippingBook Online newsletter maker