Bid 1093 - Security Replacement Project at OCS - Invitation…

Community College of Allegheny County OCS Security Camera System Pittsburgh, PA

10. 11. 12. 13.

Cable replacement for parking lot communications equipment.

Trenching of paved areas outdoors. Miscellaneous power devices and circuits. Removal of selected devices and components.

14. Fire stopping for all openings associated with this project - regardless if opening was previously not fire stopped. 15. Emergency phone towers. 16. Concrete bases for outdoor equipment. 17. Outdoor watertight accessory boxes for mounting of electronics. C. Maintaining existing raceways and wiring is a part of this project. D. The electrical contractor shall remove ceiling tiles; provide penetrations as required; patch and paint upon substantial completion.

1.4

GENERAL STIPULATIONS

A. The contractor shall procure all necessary permits to carry out their work. They shall also arrange for all tests required on any and all parts of their work by local authorities, paying all regular and proper charges for same. They shall also obtain all certificates of inspection and approval from all required authorities and the Underwriters. Underwriters' certificates in duplicate shall be furnished to the owner at the completion of the project. Also, the contractor shall furnish two copies of each intermediate Underwriters' inspection report to the Engineer and the owner. All fees and permits required shall be satisfied and obtained by the contractor and the cost shall be included in the contract price. B. When the installation is reported in writing by the Contractor to be complete and ready for acceptance, tests and inspection shall be made by the Contractor in the presence of representatives of the Engineer to ascertain whether it complies with the specifications and Contract, and upon its failure to do so, the Contractor shall at once remedy all defects and shortcomings, and any additional tests that may be required shall be entirely at the Contractor's expense. C. The Contractor shall have a managerial representative at each and every regularly scheduled job conference to receive the items that are furnished by owner, to inventory them and coordinate his work with the other trades D. This Contractor shall be entirely responsible for all apparatus, equipment, and appurtenances furnished under this Contract in connection with the work, and special care shall be taken to protect all parts thereof in such a manner as may be necessary or as may be directed. Protection shall include covers, crating, sheds, or other means to prevent dirt, grit, plaster, or other foreign substances from entering the working parts of machinery or equipment. Special care shall be taken to keep all open ends of conduit and other equipment closed while in storage and during the course of installation. Where equipment must be stored outside the building, it shall be totally covered and secured with heavy waterproof tarps and kept dry at all times. Where equipment has been subjected to moisture, it shall be suitably dried out before placed in service. All apparatus, equipment, conduit and other appurtenances shall be stored in areas designated by the Engineer.

260500-2

Made with FlippingBook Online newsletter maker