E. The Contractor shall be responsible for coordinating with all Utility Companies which have underground services adjacent to or in this job site. This Contractor shall communicate with each and every public utility company and incorporate into this project's scope of work all Utility requirements for this project. This shall include, but not be limited to, all working clearances, fees, materials, equipment, conduits, conductors, service charges, etc. As this project is primarily on private property and does not involve new services, utility coordination should be minimal.

1.5

DEFINITIONS

A. Approved Equal: The term “approved equal”, “approved”, “equal”, “equivalent”, etc. shall mean equal in all respects in the opinion of the Engineer. B. As Required: The term "as required" refers to making final connections to and/or coordinating with the appropriate authorities regarding the installation of the indicated equipment. C. Contractor: The term "Contractor", "this Contractor" or "Electrical Contractor" when used in the Contract Documents refers to the Contractor responsible for all work specified in Division 26 and as indicated on the Electrical Drawings. D. Directed: Terms such as "directed," "requested," "authorized," "selected," and "permitted" when used separately without referencing any authority, shall mean directed by the Engineer, requested by the Engineer, and similar phrases. E. Disconnect: Disconnect electrical service to indicated items. Associated conduit and wire shall be disconnected and removed, complete, back to its source. Where electrical equipment (e.g. generator) is connected to radiator, fuel, and exhaust piping, intake and exhaust ductwork, etc., this Contractor shall disconnect and remove all associated appurtenances, complete, back to their source unless noted otherwise. F. Existing to Remain: Protect construction and/or indicated items to remain against damage and soiling during selective demolition. When permitted by the Engineer, items may be removed to a suitable, protected storage location during selective demolition and then cleaned and reinstalled in their original locations. G. Finished/Unfinished Space: The term “finished space” shall mean areas where drywall is hung and installed with wall coverings and/or painted, floors are polished or coverings are installed on the floor, and the ceiling is plaster/gypsum board and/or suspended A.C.T. The term “unfinished space” refers to any area that does not meet the definition for a “finished space” as specified above. Mechanical rooms, electrical rooms, garages, etc. are typically considered “unfinished spaces”. H. Furnish: The term "furnish" when used separately, shall mean to supply and deliver to the Project site, ready for unloading, unpacking, assembly, installation, and similar operations by others. I. Indicated: The term "indicated", "shown," "noted," "scheduled," and "specified" refers to graphic representations, notes, or schedules on the Drawings; or to other paragraphs or schedules in the Specifications and similar requirements in the Contract Documents.

260500-3

Made with FlippingBook Online newsletter maker