1. Schedules indicating proposed methods and sequence of operations for selective demolition prior to commencement of Work. Include coordination for shut off of electrical service, and details for dust and noise control. a. Coordinate sequencing with construction phasing and Owner occupancy as directed. 2. Inventory of items removed and salvaged by the Contractor for the Owner for inclusion in the Operation and Maintenance Manuals. 3. Photographs or videotape, sufficiently detailed, of existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by selective demolition operations. 4. Record drawings at Project closeout according to Division 1 Section "Contract Closeout." a. Identify and accurately locate capped utilities and other subsurface structural, electrical, or mechanical conditions.

1.7

SUBSTITUTIONS

A. General: In order to establish standards of quality and performance, all types of materials listed hereinafter by manufacturer’s names and/or manufacturer’s catalog number shall be provided as specified. If this Contractor desires to substitute an item, he/she shall comply with the following administrative and procedural requirements which are included in this Section to expand the requirements as defined by Part 1 paragraph “Related Documents”. B. Substitutions will be permitted only on products specified with the phrase “or approved equal”, “or as approved”, “or equal”, “or equivalent”, etc. and the burden shall be upon the bidder to prove such equality. If the Contractor elects to prove such equality, he/she must request the Engineer’s approval in writing to substitute such item for the specified item, and shall submit supporting data, and samples if required, to permit a fair evaluation of the proposed substitution with respect to quality, serviceability and warranty. 1. Samples: When requested, samples of items that the Contractor proposes to use as substitutions for the specified products/systems shall be submitted as follows. a. A sample of both the specified item and the proposed substitute item shall be submitted simultaneously. The scheduling of the submission of such samples shall be as directed and shall in no way delay the progress of the Project. b. The Engineer will assume no responsibility whatsoever for any samples submitted. C. When the phrase “or approved equal”, “or as approved”, “or equal”, “or equivalent”, etc. appears and the Contractor desires to furnish equipment of a manufacturer other than that specified or intended, he/she shall include a complete specification of the substituted item, along with each submission copy of shop drawings, indicating the necessary modifications to the substituted product to satisfy the requirements of the Contract Documents. 1. Compliance Report: Along with each submission copy of the product data and/or shop drawing, the manufacturer shall indicate the necessary modifications to the product and/or system to satisfy the requirements of the Contract Documents. Each paragraph including

260500-6

Made with FlippingBook Online newsletter maker