Bid 1093 - Security Replacement Project at OCS - Invitation…

Community College of Allegheny County OCS Security Camera System Pittsburgh, PA

estimating the requirements or costs of successful completion of the work nor from the responsibility for the faithful performance of the provisions of this Contract. C. The Electrical Contractor shall confer with all other Contractors and shall apply for detailed and specific information regarding the location of all equipment as the final location may differ from that indicated on the drawings. Outlets, equipment or wiring improperly placed because of the Electrical Contractor's failure to obtain this information shall be relocated and reinstalled by the Electrical Contractor without additional expense to the Owner. Coordination drawings shall be initiated by the contractor responsible for the installation. This contractor shall indicate, on the architectural floor plans, equipment locations and dimensions drawn to scale, taking into consideration and incorporating proper clearances. All discrepancies and conflicts with the architectural layout of the building shall be noted on the coordination drawings. The contractor who initiated the coordination drawings shall submit them for review. Coordination and installation of any equipment not indicated on the coordination drawing shall be the responsibility of the contractor responsible for that equipment. Any modifications required by any contractor for equipment to be installed that is not shown on the coordination drawing shall be the responsibility of the contractor who failed to indicate that equipment. 1. Clearances for servicing and maintaining equipment, accessories, and specialties, including space for disassembly required for periodic maintenance. 4. Equipment and accessory service connections and support details. 5. Fire-rated wall and floor penetrations. 7. Sizes and location of required concrete pads and bases. 8. Scheduling, sequencing, movement, and positioning of large equipment into building during construction. 9. 1.11 COORDINATION DRAWINGS: A. Reflected ceiling plans to coordinate and integrate installation of air outlets and inlets, light fixtures, communication system components, sprinklers, and other ceiling-mounted items. B. Electronic Files: Provide electronic files of all shop drawings and coordination drawings in AutoCAD 2018 format or later version. Also provide drawings in a PDF format. Prepare record documents in accordance with the requirements as defined by Part 1 paragraph “Related Documents” and the following: B. Markup Procedure: During construction, maintain a set of blue or black line white prints of Contract Drawings and Shop Drawings for Project Record Document purposes. 1. Mark these Drawings to show the actual installation where the installation varies from the installation shown originally. Give particular attention to information on concealed elements that would be difficult to identify or measure and record later. Items required to be marked include, but are not limited to, the following: 1.12 RECORD DOCUMENTS A.

260500-9

Made with FlippingBook Online newsletter maker