Community College of Allegheny County OCS Security Camera System Pittsburgh, PA
3.9
CLEAN-UP
A. Daily, and when directed by the Engineer, the Electrical Contractor shall remove all waste and debris resulting from his work. B. Upon completion of his work and when directed by the Engineer, the Electrical Contractor shall remove all dirt, foreign materials, stains and fingerprints from all equipment, fixtures, panels, plates, etc., installed under this contract. Internal areas of all equipment must be cleaned of all construction dust etc., prior to pre-final and/or final inspection. 1. Clean paint, varnish spots and stains caused by finishing materials used by this Contractor from all walls, floors, trim, glass, hardware, fixtures, masonry or any other surface that is damaged by this Contractor’s work. 2. Do not use solvents that would remove or damage the finish of the finish hardware or other factory-finished materials. If damage occurs, the affected materials shall be returned to the factory for refinishing at not expense to the Owner. 3. Repair all finishes damaged by this Contractor in areas that the General Contractor does not have any work and/or the General Contractor is not required to finish the space that was affected by this Contractor’s work and leave all work clean and perfect at completion.
END OF SECTION 260500
260500-26
Made with FlippingBook Online newsletter maker