Bid 1093 - Security Replacement Project at OCS - Invitation…

Community College of Allegheny County OCS Security Camera System Pittsburgh, PA

1. Duct Banks: a. Include plans, elevations, sections, and details, including attachments to other Work. b. Indicate locations of private property boundaries and utility easements. 2. Factory-Fabricated Handholes and Boxes Other Than Precast Concrete: a. Include dimensioned plans, sections, and elevations, and fabrication and installation details. b. Include duct entry provisions, including locations and duct sizes, and methods and materials for waterproofing duct entry locations. c. Include cover design. d. Include grounding details. e. Include dimensioned locations of cable rack inserts, pulling-in and lifting irons, and other accessories. C. Field Quality-Control Submittals: 1. Field quality-control reports.

1.4

INFORMATIONAL SUBMITTALS

A. Manufacturers' Published Instructions: Record copy of official installation and testing instructions issued to Installer by manufacturer for the following: 1. All products to be installed under this contract. B. Source Quality-Control Submittals: 1. Source quality-control reports.

1.5

MAINTENANCE MATERIAL SUBMITTALS

A. Spare Parts: Furnish to Owner spare parts necessary for repairing or adding more cables to manholes or handholes that are packaged with protective covering for storage and identified with labels describing contents.

PART 2 - PRODUCTS

2.1

RACEWAYS AND FITTINGS

A.

Performance Criteria: 1. Regulatory Requirements: Listed and labeled in accordance with NFPA 70 and marked for intended location and use. 2. General Characteristics: UL 651A and UL CCN EAZX.

260543-2

Made with FlippingBook Online newsletter maker