Bid 1093 - Security Replacement Project at OCS - Invitation…

Community College of Allegheny County OCS Security Camera System Pittsburgh, PA

finished grade in deliberate traffic paths for vehicles unless otherwise indicated. Install so top of duct envelope is below local frost line. d. Support duct on duct spacers coordinated with duct size, duct spacing, and outdoor temperature. e. Elbows: 1) Use manufactured duct elbows for stub-ups and at changes of direction in duct unless otherwise indicated. Extend encasement throughout length of elbow. 2) Use manufactured steel elbows for stub-ups, at building entrances, and at changes of direction in duct run. f. Stub-ups to Outdoor Equipment: Extend concrete-encased steel raceway horizontally minimum of 60 inch (1500 mm) from edge of equipment base. 1) Stub-ups to Outdoor Equipment: Extend concrete-encased steel raceway horizontally minimum of 60 inch (1500 mm) from edge of base. Install insulated grounding bushings on terminations at equipment. a) Stub-ups must be minimum 4 inch (100 mm) above finished base and minimum 3 inch (75 mm) from conduit side to edge of base. 2) Stub-ups to Indoor Equipment: Extend concrete-encased steel raceway horizontally on exterior of wall minimum of 60 inch (1500 mm) from edge of wall. Install insulated grounding bushings on terminations at equipment. 3) Stub-ups through interior floors must be minimum 4 inch (100 mm) above finished floor and no less than 3 inch (75 mm) from conduit side to edge of equipment pad or floor slab. g. After installing first tier of duct, backfill and compact. Start at tie-in point and work toward end of duct run, leaving ducts at end of run free to move with expansion and contraction as temperature changes during this process. Repeat procedure after placing each tier. After placing last tier, hand place backfill to 4 inch (100 mm) over duct and hand tamp. Firmly tamp backfill around ducts to provide maximum supporting strength. Use hand tamper only. After placing controlled backfill over final tier, make final duct connections at end of run and complete backfilling with normal compaction. 7. Underground-Line Warning Tape: Bury conducting underground line specified in Section 260553 "Identification for Electrical Systems" no less than 12 inch (300 mm) above concrete-encased duct and duct banks and approximately 12 inch (300 mm) below grade. Align tape parallel to and within 3 inch (75 mm) of centerline of duct bank. Provide additional warning tape for each 12 inch (300 mm) increment of duct-bank width over nominal 18 inch (450 mm). Space additional tapes 12 inch (300 mm) apart, horizontally across width of ducts. 8. Ground ducts and duct banks in accordance with Section 260526 "Grounding and Bonding for Electrical Systems."

260543-9

Made with FlippingBook Online newsletter maker