Community College of Allegheny County OCS Security Camera System Pittsburgh, PA
C. Coordinate location of access panels and doors for communications items that are behind finished surfaces or otherwise concealed. D. Coordinate sleeve selection and application with selection and application of firestopping specified in Division 07 Section "Penetration Firestopping." E. The actual runs and locations of all cabling and cable tray systems shall be determined on the site and shall be installed to meet the various conditions at the building, and any changes necessary to conceal pipes or clear pipes or equipment of other trades shall be made without additional compensation. F. Where this Contractor elects to substitute materials or equipment approved for those specified, this Contractor will be held responsible for all structural, mechanical, and electrical changes required for the installation of substituted materials at no additional compensation. When the Contractor proposes to use an item or equipment other than that specified or detailed on the drawings, that is approved by the Engineer and that requires re-design of the structure, partitions, foundations, piping, wiring or any other part of the mechanical, electrical or architectural layout, then such re-design, new drawings, and detailing required for it shall be prepared by the Contractor without additional compensation. G. Lay out work from dimensions of field investigation and actual dimensions of equipment being installed. Layouts in congested areas shall not be scaled from the Mechanical, Electrical and Telecommunications Drawings. Clearances shall be provided on all sides of equipment for proper maintenance purposes as required by the equipment manufacturer and as required by the Department of Labor and Industry. All equipment, apparatus, and accessories requiring normal servicing, operation, or maintenance shall be made easily accessible. H. All equipment shall operate without objectionable noise or vibration and within Noise Criteria or Vibration Tables as determined by authorized representatives of the Architect from Sound and Vibration Control listed in the latest Edition of the ASHRAE Handbook of Fundamentals. If such objectionable noise or vibration shall be produced and transmitted to occupied portions of the building by apparatus, piping, or other parts of this work, any necessary changes, as approved, shall be made by the Contractor without cost to the owner. I. The Contractor shall be responsible for providing all necessary fire-resistant materials and covers where fire-rated construction is penetrated under this Contract. Materials shall be furnished by the Contractor as required to maintain the fire rating of the walls, partitions, ceilings, and floors in accordance with the requirements of NFPA, the Pennsylvania Department of Labor and Industry , International Building Code (IBC) 2015, and all other applicable codes. J. This Contractor shall disconnect and remove all telecommunications cabling and other associated telecommunications equipment in conjunction with removed cameras and other miscellaneous equipment. Relocated equipment shall be reconnected to telecommunication systems at their new locations. K. Where present piping or equipment is removed and unused openings remain in walls, floors, ceilings, partitions, and similar locations, the openings shall be properly patched by this Contractor in a manner satisfactory to the Architect.
270500-2
Made with FlippingBook Online newsletter maker