Bid 1093 - Security Replacement Project at OCS - Invitation…

Community College of Allegheny County OCS Security Camera System Pittsburgh, PA

SECTION 271300 - COMMUNICATIONS CABLING

PART 1 - GENERAL

1.1

RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2

SUMMARY

A.

Section Includes: 1.

Data communications cabling.

2. 3.

Fire stopping.

Interior Communication Pathways requirements.

1.3

DESCRIPTION OF WORK

A. The Contractor shall furnish all labor and material necessary for a complete data system B. The Contractor shall furnish and install all cabling, connectors and all appurtenances required for a complete voice and data distribution systems and as indicated on the Contract Documents. C. All cabling types, manufacturers, connection types, installation hardware, etc. contained in this specification are to be provided as specified without substitution. This is in keeping with the standardization of this type of product and system that is already in place and thoroughly tested throughout the CCAC campus system.

1.4

CODE AND STANDARDS COMPLIANCE

A. Design, manufacture, test, and install telecommunications cabling networks per manufacturer's requirements and in accordance with NFPA-70 (National Electrical Code(r)), state codes, local codes, requirements of authorities having jurisdiction and particularly the following standards: 1. ANSI/TIA/EIA-568B.1 (Annexes A-E) -- Commercial Building Telecommunications Cabling 2. ANSI/TIA/EIA-568B.2 – Balanced Twisted Pair Cabling Components (Includes TIA854 1000 BaseTX)ANSI/TIA/EIA-568B.3 – Optical Fiber Cabling Components. 3. ANSI/TIA/EIA-569-A (Addenda 1-6) -- Commercial Building Standard for Telecommunications Pathways and Spaces 4. ANSI/TIA/EIA-606-A -- The Administration Standard for the Telecommunications Infrastructure of Commercial Buildings.

271300 - 1

Made with FlippingBook Online newsletter maker