Bid 1093 - Security Replacement Project at OCS - Invitation…

Community College of Allegheny County OCS Security Camera System Pittsburgh, PA

5. ANSI/TIA/EIA-568-A-5, Transmission Performance Specifications for 4- pair 100 Ω B. Testing Category 6A 1. Test results shall include a record of test frequencies, cable type, conductor pair and cable (or Outlet) I.D., measurement direction, test equipment type, model, serial number, date, reference setup and crew member name(s). 2. Printouts generated for each cable by the wire (or fiber) test will be submitted as part of the documentation package. The Contractor will also furnish this information in electronic form via email (or physical media) to CCAC’s designated representative. These media shall contain the electronic equivalent of the test results as defined by the bid specification and be of a format readable from Microsoft Word. Alternately, the Contractor shall provide a licensed copy of the software required to view and print the data. The Contractor shall furnish 1 copy of the data and display (if applicable) software.

C.

Labeling 1.

The punch-down blocks and patch panels in the TRs shall be marked and labeled by the Contractor so that each voice and data cable can be associated with a specific RJ-45 at a specific workstation. Patch panels shall also be labeled V1, V2, D1, D2, etc. Hand written labels are unacceptable. The prints supply the acceptable wiring labeling scheme. All faceplate labels shall be on paper labels with clear covers. All labels on Cat-6 patch panels shall not cover the patch panel port numbers. All copper riser Cat-6A patch panels shall be labeled by house pairs. House pair labels shall cover port numbers on the patch panels. Faceplate Example TR Example (same cable) FP# - Port# -TR - Panel# - Port# Room - FP# - Outlet# 1-2-B209-V2-28 B104-1-2

3.2

IMPLEMENTATION

A. The Contractor shall test the entire system operation and shall certify in writing that the system has been thoroughly tested by the Contractor and is ready for implementation. The Owner reserves the right to have a representative present for all testing and/or to verify the results of all tests. B. Upon successful implementation the Contractor shall: 1. Immediately correct any problems and complete any installation tasks outstanding. 2. Re-route any temporary cable. 3. Install blank faceplates on abandoned cable locations. 4. Alternatively, supply a bid to remove all abandoned cabling. 5. The Contractor agrees to provide two (2) sets of Product bay-face and equipment room drawings in .dwg/.dxf file format prior to CCAC’s Final Acceptance of the products.

271300 - 5

Made with FlippingBook Online newsletter maker