Community College of Allegheny County OCS Security Camera System Pittsburgh, PA
1.5
ACTION SUBMITTALS
A.
Product Data: For each type of product.
B. Shop Drawings: Reviewed and stamped by RCDD. 1. System Labeling Schedules: Electronic copy of labeling schedules, in software and format selected by Owner. 2. System Labeling Schedules: Electronic copy of labeling schedules that are part of the cabling and asset identification system of the software. 3. Cabling administration Drawings and printouts. 4. Wiring diagrams and installation details of telecommunications equipment, to show location and layout of telecommunications equipment, including the following: a. Telecommunications rooms plans and elevations. b. Telecommunications pathways. c. Telecommunications system access points. d. Telecommunications grounding system. e. Telecommunications conductor drop locations. f. Typical telecommunications details. g. Mechanical, electrical, and plumbing systems. C. Fiber optic cable testing plan.
1.6
INFORMATIONAL SUBMITTALS
A. Qualification Data: For Installer, installation supervisor, and field inspector. B. Product Certificates: For each type of product. C. Source quality-control reports. D. Field quality-control reports.
1.7
CLOSEOUT SUBMITTALS
A. Maintenance Data: For optical fiber cable, splices, and connectors to include in maintenance manuals.
1.8
MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. 1. Connecting Blocks: One (1) of each type. 2. Jacks: Five (5) of each type.
271523-2
Made with FlippingBook Online newsletter maker