SPECIAL PROJECT PROCEDURES
SECTION 0l000
Section 0l000 - Page 0l000-l
SPECIAL PROJECT PROCEDURES
PART l GENERAL
l.
0l RELATED DOCUMENTS A.
Drawings and general provisions of the Contract including General and Supplementary Conditions and all other Division l specification sections apply to work of this section. A mandatory pre-bid meeting will be held on the construction Site. The date and time is indicated on the Invitation to Bid sheet. All prospective bidders MUST attend. The location of the Project is the Allegheny Campus for Community College of Allegheny County. The College will designate an area adjacent to the building for use by the Contractor for a dumpster, a job trailer, a staging area and/or for storage. Protection and security of materials is the responsibility of the Contractor. Parking for Contractors' vehicles will be designated by the Owner in the College parking lots. Interior spaces will be occupied throughout the construction phase. Prior to the start of work, Contractor shall develop a phasing schedule for the implementation of the work. Owner will cooperate with the Contractor in providing access to a given area as work proceeds according to the phasing schedule.
B.
l.2
SITE A.
B.
C.
l.3
USE OF PREMISES A.
B.
Made with FlippingBook Online newsletter maker