SUMMARY
Section 0l100 - Page 0l100-3
1.6
OWNER ’S OCCUPANCY REQUIREMENTS
A. Partial Occupancy: The Owner will occupy the premises during entire construction period. Cooperate with the Owner during construction operations to minimize conflicts and facilitate the Owner ’s usage. Perform the work so as not to interfere with use of the premises. 1. Maintain access to existing walkways, in as much as practical, and other adjacent occupied or used facilities. 2. Construction access to work area shall not be routed through a finished or occupied space without authorization and appropriate protection of finishes.
1.7
Provide not less than 72 hours ’ notice to the Owner of activities that will affect site occupied areas or activities.
1.8
SHUTDOWN OF UTILITIES
Not applicable.
1.9
NOISE AND VIBRATION CONTROL
A. In most instances, noise control will be a matter of prime concern. It is therefore mandatory that equipment such as compressors, generating equipment, etc. be fitted with mufflers or other noise abatement attachments. B. Coordinate the scheduling and use of noise/vibration- producing equipment with the Construction Manager.
1.10
OWNER OWNED EQUIPMENT
A. The use of Owner-owned equipment is prohibited. It shall be the responsibility of Contractors performing work at the Owner to provide tools, equipment and materials necessary to perform the work.