SUMMARY OF PROJECT

Section 0l010 - Page 0l010-4

E.

Contractor shall maintain safe egress and ingress to all areas of the building for occupants and visitors. The use of specific existing toilets within the building by the Contractor or their personnel will be permitted. Toilet areas are to be maintained by the Contractor. Confine Operations at the site to areas permitted by Law, Ordinances, Permits, and the Contract documents Unreasonable encumbrance to the site with materials and equipment is not permitted. Loading the structure with weight that will endanger structure is not permitted. Responsibility for protection and safekeeping of products stored on the premise is the Contractor's. Stored products that interfere with operations of Owner or other contractor shall be moved. Additional storage or work areas needed for operations shall be obtained and paid by Contractor.

F.

G.

H.

I.

J.

K.

L.

M.

Use of site for storage shall be limited.

l.l

0 OWNER OCCUPANCY A.

Owner will occupy the premises during the entire period of construction for the conduct of his normal operations. Cooperate with College so as not to interfere or disrupt normal operations of the College. Any work which will require complete occupation of an area by the Contractor for accomplishment and not permit normal function of the College operations within the area will be accomplished outside of the regular College ’ s working hours and must be scheduled not less than seventy-two (72) hours in advance.

Made with FlippingBook Online newsletter maker