ALTERATION PROJECT PROCEDURES
Section 0l03l - Page 0l03l-2
l.4
ALTERATIONS, CUTTING AND PROTECTION A.
Assign the work of moving, removal, cutting and patching to trades qualified to perform the work in a manner to cause least damage to each type of work, and provide means of returning surfaces to appearance of new work. Perform cutting and removal work to remove minimum necessary, and in a manner to avoid damage to adjacent work. l. Perform cutting and patching as specified in Section 0l045. Protect existing finishes, equipment and adjacent work that is scheduled to remain from damage. l. Protect existing and new work from weather and extremes of temperature. a. Provide weather protection, waterproofing, heat and humidity control as needed to prevent damage to remaining existing work and to new work. The Contractor shall provide temporary enclosures as specified in Section 0l500, to separate work areas from the existing building and from areas occupied by Owner and to provide weather protection. Discoveries of construction, having a historic or private value shall remain in the possession of Owner. l. Promptly notify Owner. 2. Protect discovery from damage from elements or work. 3. Contractor shall store items to be retained by Owner in a safe, dry place on site, or shall dispose of items which Owner releases.
B.
C.
D.
E.
Made with FlippingBook Online newsletter maker