CUTTING & PATCHING
SECTION 01045
Section 01045 - Page 01045-1
CUTTING & PATCHING
PART 1 GENERAL
1.1
SECTION INCLUDES A. Requirements and limitations for cutting and patching of work.
1.2
RELATED SECTIONS A.
Section 01031 – Alteration Project Procedures
B. C.
Section 01300 - Submittals
Section 01600 - Materials & Equipment: Product Options and Substitutions. Individual Product Specification Sections: 1. Cutting and patching incidental to work of the Section.
D.
2.
Advance notification to other Sections of openings required to work of those Sections. Limitations on cutting structural support members.
3.
4.
Third Floor Server Room Special Precautions All Applications.
1.3
SUBMITTALS A.
Submit written request in advance of cutting or alteration which affects: 1.
Structural integrity of any element of Project. Integrity of weather-exposed or moisture- resistant element. Efficiency, maintenance or safety of any operational element. Visual quality of sight exposed elements.
2.
3.
4. 5.
Work of Owner or separate Contractor.
B.
Include in request: 1.
Identification of Project.
2. 3. 4. 5. 6. 7.
Location and description of affected work.
Necessity for cutting or alteration.
Description of proposed work and products to be used.
Alternatives to cutting and patching.
Effect on work of Owner or separate Contractor.
Written permission of affected separate
Made with FlippingBook Online newsletter maker