CUTTING & PATCHING

Section 01045 - Page 01045-2

PART 2 PRODUCTS

2.1

MATERIALS A.

Primary Products: Those required for original installation. Product Substitution: For any proposed change in materials, submit request for substitution under provisions of Section 01600.

B.

PART 3 EXECUTION

3.1

EXAMINATION A. Inspect existing conditions prior to commencing work, including elements subject to damage or movement during cutting and patching. B. After uncovering existing work, inspect conditions affecting performance of work. C. Beginning of cutting or patching means acceptance of existing conditions.

3.2

PREPARATION A.

Provide temporary supports to ensure structural integrity of the work. Provide devices and methods to protect other portions of Project from damage. B. Provide protection from elements for areas which may be exposed by uncovering work.

3.3

CUTTING AND PATCHING A.

Execute cutting, fitting and patching including excavation and fill to complete work. B. Fit products together to integrate with other work. C. Uncover work to install ill-timed work. D. Remove and replace defective or nonconforming work. E. Remove samples of installed work for testing when requested. F. Provide openings in the work for penetration of electrical work.