Community College of Allegheny County Pittsburgh, Pennsylvania
2022 Library Roofing Project
b.
Upper Library Row Roofs: (1)
Install .050-inch Kynar Pre-Finished Aluminum coping withcontinuous cleat.
(2)
Color: Chosen by Owner from manufacturer’s standard color chart.
c.
Install miscellaneous metal flashings and related accessories using manufacturer’s membrane coated metal. (1)
Install scuppers, pitch pans with hoods, gravel stop fascia, drip edge, and miscellaneous metal-flanged details. Fabricate metal flashings with flanges using membrane coated metal. Secure flange to wood blocking as specified. Heat-weld a 6-inch wide (reinforced) cover strip to field membrane and coated metal flange.
(2)
(3)
(4)
Seal pitch pans with TremSEAL Pitch Pocket Sealer.
d.
Counter flashings, storm collars, sleeve flashings, etc. Shall be 24-gauge Stainless Steel unless specified otherwise (excluding Membrane Coated Metal). Install miscellaneous metal flashings and related accessories. (1) Reference manufacturer’s detail drawings attached. (2) Detail drawings are to show intent and may be modified to fit field conditions and project specifications.
e.
16. Install TremPly KEE walkway pads at roof access points and to match existing
February 2022
01010-9 SUMMARY OF WORK
Made with FlippingBook - Online Brochure Maker