Community College of Allegheny County Pittsburgh, Pennsylvania
2022 Library Roofing Project
D. Remove waste and surplus materials, rubbish, and construction facilities from the site.
1.06
ADJUSTING
A.
Adjust equipment on the roof top that has been reset and relocated.
1.07
PROJECT RECORD DOCUMENTS
A. Maintain on site one set of the following record documents; record actual revisions to the Work: 1. Drawings. 2. Specifications. 3. Addenda. 4. Change orders and other modifications to the Contract. 5. Reviewed shop drawings, product data, and MSDS information sheets. 6. Manufacturer’s instructions for assembly, installation, and adjusting.
B. Ensure entries are complete and accurate, enabling future reference by Owner.
C.
Store record documents separate from documents used for construction.
D.
Record information concurrent with construction progress.
E. Specifications: Legibly mark and record at each product section description of actual products installed, including the following: 1. Manufacturer’s roofing system. 2. Product substitutions or alternates utilized. 3. Changes made by Addenda and modifications.
1.08
WARRANTIES:
A.
Roofing Contractor’s Guarantee: 1.
Upon project completion and Owner acceptance, effective upon complete payment the Roofing Subcontractor shall issue Weatherproofing Technologies, Inc. a guarantee against defective workmanship and materials for a period of two (2) years.
B.
Tremco Warranty: 1.
Upon project completion, Tremco acceptance, Tremco shall deliver to Owner a Tremco Roofing System Quality Assurance Warranty for a period of Thirty (30) years. a. Roof Sections: Theater Roof West and Theater Roof East. b. ADD / Alternate: Upper Library Row Roofs A, B, C, D, E, F, and G.
PART 2 – PRODUCTS - Not used.
PART 3 – EXECUTION - Not used.
END OF SECTION
February 2022
01700 - 2 CONTRACT CLOSEOUT