TREX SIGNATURE ® HORIZONTAL MESH RAILING Installation Instructions
HOW TO INSTALL MESH TRADITIONAL RAILING
NOTES: » Trex Signature Cocktail Rail brackets (sold separately) are for use with either Trex Signature Cocktail or Trex Signature Traditional designs. For a 6' section, use 4 brackets and screws provided, for 8' section, use 5 brackets and screws provided. » Top Bracket Covers should be installed prior to the attachment of the 2x4.
Traditional Railing When Using Trex Signature Posts
6. R emove 2 x 4 from rail. Using a router bit, forstner bit, or something similar, rout out this area to allow 2 x 4 to fully seat onto top rail.
7. Secure 2 x 4 to top rail using Trex Signature Cocktail Bracket (sold separately). Ensure that there is a bracket at each end of the railing section, then space brackets approximately every 24" and attach with 4 screws provided.
7
NOTE: Predrilling before attachment is recommended.
1. Install Signature Posts per instructions provided.
8. Attachment of Bottom Rail Bracket Covers, Skirts, and Caps See instructions on previous page.
2. Follow instruction steps 5a - 24 on pages 5-9 for installation.
NOTE: IF USING SWIVEL BRACKETS REFER TO LAST PAGES FOR PROPER MEASUREMENT TECHNIQUES
Traditional Railing When Using Trex Post Sleeves
3
4
3. Measure between posts and cut 2 x 4 to length.
4. Place 2 x 4 on Signature top rail.
Important: Only use with Pressure-treated post, Trex Post Mounts or Trex Joist Mount Post WITH Trex post sleeves.
5. O n underside of 2 x 4, mark outline of bracket cover location.
10
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TR-SIGNATUREMP-0825
Made with FlippingBook Digital Publishing Software