Trex Signature® Mesh Railing Installation Instructions

TREX SIGNATURE ® MESH STAIR RAILING Installation Instructions

HOW TO INSTALL STANDARD MESH STAIR RAILING/ CONTINUED TREX SIGNATURE ®

44

44. A ttach bottom stair rail to bottom stair brackets using two #10 x 1” self-tapping screws (provided) on each side of bracket. YOU MUST PREDRILL ALL EXISTING LOCATIONS FIRST USING 9/64” BIT THAT WAS PROVIDED

42

IN HORIZONTAL MOUNTING KITS.

46

45. Attach top stair rail to

top stair brackets using two #10 x 1” self-tapping screws (provided) on each side of bracket. YOU MUST PREDRILL ALL EXISTING LOCATIONS FIRST USING 9/64” BIT THAT WAS PROVIDED

42. .Drop assembled stair mesh rail panel into brackets. E nsure that rails are fully seated into brackets and verticals are completely seated on rails. Installing Snap-in Channel Filler

IN HORIZONTAL MOUNTING KITS.

43

Attachment of Bracket Covers, Skirts, and Caps

47

46

Signature Post

46. Attach corresponding bracket covers over opening in upper and bottom rails. 47. Attach provided post skirt to bottom of posts when using Trex Signature posts.

43. Cut snap-in channel filler to correct length and install into channels of bottom and top stair rails. Use of a rubber mallet may assist with this step. DO NOT attempt to cut short snap-in pieces with a miter saw. Use an angle grinder or hack saw only.

12

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TSMSR-0125

Made with FlippingBook Digital Publishing Software