TREX SIGNATURE ® HORIZONTAL MESH RAILING Installation Instructions
HOW TO INSTALL MESH RAILING/ CONTINUED
Installing Vertical PVC Gaskets onto Vertical Supports (No cutting required these come standard size.)
16
18
16. S tarting at one end, push mesh (with bottom PVC gasket installed) firmly into the bottom rail. GENTLE tapping with rubber mallet on mesh CROSS-SECTIONS will help prevent mesh from bending.
18. Align and install vertical PVC gaskets into the vertical supports.
NOTE: Make sure mesh is being secured by hand until final assembly of the top rail.
Installing Vertical Supports
Installing L-Brackets into Vertical Supports
19
17
Stop Tab
Stop Tab
17. Install L-brackets into both top and bottom slots of vertical supports as shown. L-brackets will require light tapping until stop lip of bracket is resting on vertical support.
19. Install vertical supports onto mesh panel, also ensuring that L-bracket is fully seated into bottom rail channel. IMPORTANT NOTE: USE SOAPY WATER ON THE VERTICAL SUPPORTS/PVC GASKETS TO ALLOW THIS TO SLIDE DOWN THE MESH PAN EL
6
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TR-SIGNATUREMP-0825
Made with FlippingBook Digital Publishing Software