Trex Signature® Mesh Railing Installation Instructions

TREX SIGNATURE ® HORIZONTAL MESH RAILING Installation Instructions

HOW TO INSTALL MESH RAILING/ CONTINUED

Installing Vertical Supports

Installing Top Rail onto Mesh Panel

21

19

19. Install vertical supports onto mesh panel, also ensuring that L-bracket is fully seated into bottom rail channel. IMPORTANT NOTE: USE SOAPY WATER ON THE VERTICAL SUPPORTS/PVC GASKETS TO ALLOW THIS TO SLIDE DOWN THE MESH PANEL

21. Starting at one end and working down, press the top rail firmly onto the top of the mesh panel (with top PVC gasket on mesh). Ensure the top rail is centered properly so top rail will seat into brackets when finished.

Attaching L-Brackets to Top and Bottom Rails

Installing Top PVC Gasket onto Mesh Panel

22

20

22. .Attach L-Brackets to both top and bottom rails using one #8 x 5/8 flat head screw (provided).

20.Install cut gasket onto top of mesh panel. Make sure gasket is fully seated onto mesh.

8

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-SIGNATUREMP-0125

Made with FlippingBook Digital Publishing Software