Trex Signature® Mesh Railing Installation Instructions

TREX SIGNATURE ® HORIZONTAL MESH RAILING Installation Instructions

HOW TO INSTALL MESH COCKTAIL RAILING

NOTES: » Do not use Enhance deck board for Cocktail rail applications.

»  Trex Signature Cocktail Rail brackets (sold separately) are for use with either Trex Signature Cocktail or Trex Signature Traditional designs. For a 6' section, use 4 brackets and screws provided, for 8' section, use 5 brackets and screws provided. » Top Bracket Covers should be installed prior to the attachment of the deck board.

Cocktail Railing When Using Trex Signature Posts

7. S ecure boards to top

rail using Trex Signature Cocktail Bracket (sold separately). Ensure that there is a bracket at each end of the railing section, then space brackets approximately every 24" and attach with 4 screws provided.

7

NOTE: Pre-drilling before attachment is recommended.

8.  Attachment of Bottom Rail Bracket Covers, Skirts, and Caps See instructions on previous page.

1. Install Signature Posts per instructions provided.

2. F ollow instruction steps 5a - 24 on pages 5-9 for installation.

Cocktail Railing When Using Trex Post Sleeves

3

4

3. M easure between posts and cut deck board to length.

IMPORTANT NOTE: »  Important: ONLY for use with pressure treated 4 x 4 post (3.5" nominal square) and 4" x 4" (102 mm x 102 mm) post sleeve. Cutting post and post sleeve ONLY apply to the Cocktail style railing.

4. P lace deckboard onto top rail.

5. O n underside of deck board, mark outline of bracket cover location.

6. R emove deck board from rail. Using router bit, forstner bit, or something similar, rout out this area to allow deck board to fully seat onto top rail.

8

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TR-SIGNATUREMP-0825

Made with FlippingBook Digital Publishing Software