HOW TO INSTALL MESH RAILING/ CONTINUED
Attaching Top Rail to Brackets
25
23
25. Install two #8 x 1-1/4" screws provided into top rail and top bracket on each end of top rail.
23. D rill two 1/2" holes approximately 1/2" from end of top rail. Repeat this on opposite side of top rail.
26
IMPORTANT NOTES: » HOLES CANNOT EXTEND PAST
1/2" (1.3 cm)
BRACKET, OTHERWISE BRACKET COVER WILL NOT COVER HOLES. » ONLY DRILL 1/2" HOLES
Bracket Edge
Post
THRU TOP WALL OF TOP RAIL. DO NOT USE A STEP BIT.
24
26. Cut snap-in channel filler to correct length and install into channels of bottom and top rails. Use of a rubber mallet may assist with this step. DO NOT attempt to cut short snap in pieces with a miter saw. Use an angle grinder or hack saw only.
24. Using 9/64" bit provided, center into above holes and PREDRILL into top rail bracket at a depth of approximately 1-1/4". Use care to not drill through underside of top bracket.
9
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TR-SIGNATUREMP-0125
Made with FlippingBook Digital Publishing Software