HOW TO INSTALL ROD RAIL STANDARD STAIR RAILING/ CONTINUED TREX SIGNATURE ®
14
17
14. C lamp first vertical (lower part of stairs) in place, using width of stair template to position.
17. C lamp top vertical (upper part of stairs) in place, using width of stair template to position.
18
15
15. Clamp middle vertical(s) in place.
18. .Mark angle cuts at top and bottom on all verticals.
19.A fter removing rods and verticals, make angle cuts on top and bottom of verticals following marks from previous step.
16
19
16. S lide a rod into top and bottom of all verticals. Ensure that distance of top rod to top rail and bottom rod to bottom rail are equal.
5
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TRRSR-0422
Made with FlippingBook - PDF hosting