Trex® Rod Rail Installation Instructions

TREX® ROD RAIL STAIR RAILING Installation Instructions

HOW TO INSTALL ROD RAIL STANDARD STAIR RAILING/ CONTINUED TREX SIGNATURE ® Vertical and Rod Assembly

24

20

20.Insert anti-rattle strips into the vertical supports. NOTE: There are two anti-rat- tle strips for each support which can only be inserted in one side.

24. Slide rods into lower end and all intermediate verticals.

NOTE: When inserting rods into intermediate supports, keep rods straight to avoid scratching.

21

25

2

25.Slide upper end vertical onto rods and attach to bottom rail using ST Wedge Spacer and screws provided.

21. U sing the slot on the HZ template, locate marked line and drill two 7/64” pilot holes at each mark (or mark with a punch).

26

NOTE: Pilot holes will be drilled out larger in next step.

22.Using pilot holes

22

(or marks), drill 5/16” holes for all vertical supports in both top and bottom rails.

26.Using a mallet, install bottom rail cover onto bottom rail.

Installing Top and Bottom Rails

27

23

2

23.Install lowest end vertical and all intermediate verticals to bottom rail using ST Wedge Spacer and screws provided.

27.Install top rail to all vertical and end supports using S Wedge Spacer and screws provided.

6

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TRRSR-0422

Made with FlippingBook - PDF hosting