TREX® ROD RAIL STAIR RAILING Installation Instructions
HOW TO INSTALL ROD RAIL STANDARD STAIR RAILING/ CONTINUED TREX SIGNATURE ® Vertical and Rod Assembly
24
20
20.Insert anti-rattle strips into the vertical supports. NOTE: There are two anti-rat- tle strips for each support which can only be inserted in one side.
24. Slide rods into lower end and all intermediate verticals.
NOTE: When inserting rods into intermediate supports, keep rods straight to avoid scratching.
21
25
2
25.Slide upper end vertical onto rods and attach to bottom rail using ST Wedge Spacer and screws provided.
21. U sing the slot on the HZ template, locate marked line and drill two 7/64” pilot holes at each mark (or mark with a punch).
26
NOTE: Pilot holes will be drilled out larger in next step.
22.Using pilot holes
22
(or marks), drill 5/16” holes for all vertical supports in both top and bottom rails.
26.Using a mallet, install bottom rail cover onto bottom rail.
Installing Top and Bottom Rails
27
23
2
23.Install lowest end vertical and all intermediate verticals to bottom rail using ST Wedge Spacer and screws provided.
27.Install top rail to all vertical and end supports using S Wedge Spacer and screws provided.
6
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TRRSR-0422
Made with FlippingBook - PDF hosting