HOW TO INSTALL HORIZONTAL ROD RAILING SWIVEL BRACKETS TREX SIGNATURE ®
Attach Swivel Brackets Base Using Trex Signature Posts TIP: Use a clamp to help hold brackets in place while fastening with screws.
Attach Swivel Brackets Using Pressure-treated Posts and Post Sleeves TIP: Use a clamp to help hold brackets in place while fastening with screws
2
1
1
1. Measure 1-3/8"
(3.5 cm) from top of post base plate or 1-7/8" (4.8 cm) from decking surface. Mark with light line.
2-1/2" Post
1-3/8" (3.5 cm)
1-7/8" (4.8 cm)
2
3
1. M easure 1-7/8" (4.8 cm) up from deck surface to bottom of bracket. Slide skirt up to allow for proper measurement, then push skirt back down onto surface of decking BEFORE ATTACHING BRACKET. Mark with light line. 2. C enter lower bracket on post above the marked line and attach using four 2" (5.1 cm) wood screws (provided) .
32-5/16" (82.0 cm) or 38-5/16" (97.3 cm)
3
4
2. C enter lower bracket on post above the marked line and attach using four self-tapping screws (provided) . 3. M easure up 32-5/16" (82.0 cm) for 36" (91.4 cm) tall railing or 38-5/16" (97.3 cm) for 42" (106.7 cm) tall railing from top of lower rail bracket. Mark with a light line. 4. Center upper bracket on post below marked line 4
32-5/16" (82.0 cm) or 38-5/16" (97.3 cm)
3. M easure up 32-5/16" (82.0 cm) for 36" (91.4 cm) tall railing or 38-5/16" (97.3 cm) for 42" (106.7 cm) tall railing from top of lower rail bracket. Mark with a light line. 4. C enter upper bracket on post below marked line and attach using four 2" (5.1 cm) wood screws (provided) .
and attach using four self-tapping screws (provided) .
NOTE: Upper bracket is not required on
crossover post configuration.
5
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TRRHR-0323
Made with FlippingBook - PDF hosting