Trex® Rod Rail Installation Instructions

TREX® ROD RAIL HORIZONTAL RAILING Installation Instructions

HOW TO INSTALL ROD RAIL STANDARD RAILING TREX SIGNATURE ®

Cutting Railings and Covers

KEY Mark Cut

KEY

5

5. C ut both bottom and top rail to length as determined above.

7

6 Bottom rail

1. P repare a solid work surface area (plywood, deck surface, etc.). How to Measure Bottom and Top Railings (When Required) 2.  For Full Span Post to Post Applications – only top rail will need to be cut. 3.  For Full Span Crossover to Crossover post Applications – no rails have to be cut, HOWEVER the location of the HZ Template on the top rail will need to be adjusted in 3/4" on each side of top rail to allow for proper placement of vertical supports.

Bottom rail cover

6. M ark and cut bottom rail cover the same length as bottom rail.

7. M ark and cut top rail cover same length as top rail for all top rail configurations.

Locating Vertical Holes on Bottom and Top Rails

4

8

2

4. M easure distance between posts (X), and subtract 1/2" for bracket clearance.

8. P lace HZ template at end of top and bottom rails. Pre-drill pilot holes (using a 7/64" bit or small punch) at locations. Ensure that template is oriented correctly before drilling holes. NOTES: » Template is labeled for the type of bracket used. » Pilot holes will be drilled out larger in a later step. » F or Compound Swivel Brackets, set the rail in the bracket and mark 3.75" from the post .

If installing crossover post configurations adjust top rail length : X + 3/4" if using one crossover post, or X + 1-1/2" if using two crossover posts.

If using swivel brackets, measure distance between brackets and cut railings to this distance.

6

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TRRHR-0323

Made with FlippingBook - PDF hosting