Trex® Rod Rail Installation Instructions

HOW TO INSTALL ROD RAIL STANDARD RAILING/ CONTINUED TREX SIGNATURE ®

11

6 ' Rail Spans or Shorter

11. Using pilot holes

(or marks), drill 1/4" holes for all vertical supports in both top and bottom rails. NOTE: Clean any burrs from edges of holes to ensure good fit on both sides.

9a

Cutting Rods to Length (When Required)

9a.Measure the distance between the vertical end holes on both top and bottom rails . Mark the center. IMPORTANT NOTE: DO NOT mark the line across the entire width of the bottom rail, as it will be visible after install. Maximum recommended line width is 1".

12

Over 6' Rail Spans

9b

12. M easure the distance between the end (outer) holes (X") on top or bottom rail and add 3/8" to this measurement.

NOTE: If installed at exact spans, rods do not have to be cut.

13

9b..Measure the distance between the vertical end holes on both top and bottom rails . Divide the distance into thirds and make two marks on top and bottom rails.

NOTE: Maximum unsupported rod span is 32.25

Locating and Drilling Midspan Holes

10

13. C ut rods to the length measured in previous step.

Vertical and Rod Assembly

14

14. Insert anti-rattle strips

into the vertical supports.

2

NOTE: There are two anti- rattle strips for each support which can only be inserted in one side.

10. U sing the slot on the HZ template, locate marked line and drill two 7/64" pilot holes (or mark with a punch). NOTE: Pilot holes will be drilled out larger in next step.

7

Have Questions? 1–800–BUY–TREX

NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com

TRRHR-0323

Made with FlippingBook - PDF hosting