TREX® ROD RAIL HORIZONTAL RAILING Installation Instructions
HOW TO INSTALL ROD RAIL COCKTAIL RAILING TREX SIGNATURE
NOTES: » Do not use Enhance deck board for Cocktail rail applications. » Trex Signature Cocktail Rail brackets (sold separately) are for use with either Trex Signature Cocktail or Trex Signature Traditional designs. For a 6' section, use 4 brackets and screws provided, for 8' section, use 5 brackets and screws provided. » Top Bracket Covers should be installed prior to the attachment of the deck board.
Cocktail Railing When Using Trex Signature Posts
Attaching Deck Board to Top Rail
7. S ecure boards to top
7
rail using Trex Signature Cocktail Bracket (sold separately). Ensure that there is a bracket at each end of the railing section, then space brackets approximately every 24" and attach with 4 screws provided.
NOTE: Pre-drilling before attachment is recommended.
8. Attachment of Bottom Rail Bracket Covers, Skirts, and Caps
1. Install Signature Posts per instructions provided.
2. Follow instruction steps 1-28 on pages 6-18 for railing installation.
See instructions on previous page.
4
3
Cocktail Railing When Using Trex Post Sleeves
3. Measure between posts and cut deck board to length.
4. Place deck board onto top rail.
5. O n underside of deck board, mark outline of bracket cover location. 6. R emove deck board from rail. Using router bit, forstner bit, or something similar, rout out this area to allow deck board to fully seat onto top rail.
IMPORTANT NOTES: » ONLY for use with pressure treated 4 x 4 post (3.5" nominal square) and 4" x 4" (102 mm x 102 mm) post sleeve. Cutting post and post sleeve ONLY applies to the Cocktail style railing. 1. Installing Pressure-treated Posts, Post Sleeves, and Skirts to Use with Rod Rail Cocktail Railing.
8
Have Questions? 1–800–BUY–TREX
NOTE: Construction methods are always improving. Please ensure you have the most up-to-date installation instructions by visiting: trex.com
TRRHR-0825
Made with FlippingBook - PDF hosting