For Sarawak 2x500MW

FOR SARAWAK

A hydroelectric power plant, the Stand-Alone Hydro system that operates independently and includes an air storage unit can generate hydrogen and store excess energy and acid while diverting surplus power to the public power grid. This Stand-Alone Hydro system, meticulously designed for Sarawak, is a testament to our commitment to precision and efficiency. It consists of two sections, each with a capacity of 500MW. Each section comprises 1818 module units, each accommodating a 275kWh Stand-Alone Hydro system, designed with utmost precision and efficiency. With meticulous planning and a focus on efficient implementation, the required dimensions for each module unit have been carefully calculated to be 8 meters by 22 meters, with a minimum height clearance of 28 meters from the ground. The installation period for each 500MW section is estimated to be 15 months, ensuring a smooth and efficient project implementation. The price for 1MWh Stand-Alone Hydro is RM12,850,000.00, and the total for two sections of 500MW will be RM12,850,000,000.00.

Made with FlippingBook - professional solution for displaying marketing and sales documents online