For Sarawak 15MW

Flow process of the hydro Section 1

WATER ENERGY

Top tank water release through the 32 degrees angle pipe down. The water reaches the Pelton turbine, Pelton spins the generator. Energy generated and released out. Section 2 Water from the Pelton turbine falls down and goes through 4 sets of Pryter Impeller. Energy again generates and use by the water pumps. Water sucks by the water

pump and pushes to the top tank via the 90 degrees pipe. The water reaches the top tank. Restart the process.

Made with FlippingBook - professional solution for displaying marketing and sales documents online