Tracks 2021

Lower Bois d’Arc Reservoir Construction Honey Grove, Texas

10,400’-long, 90’-tall earthen embankment

170,000 CY of soil cement armoring 150,000 CY of internal drainage filters 30,000 CY of cast-in-place concrete

Ash Pond Closure Dredging Project Alabama

10,738,000 CY of bulk dredging 10,738,000 CY of surge pond slurry feed 39-month ash pond water management

24

pandj.com

Made with FlippingBook Ebook Creator